"

亚搏全站手机客户端-亚搏全站客户端官方拥有全球最顶尖的原生APP,每天为您提供千场精彩体育赛事,亚搏全站手机客户端-亚搏全站客户端官方更有真人、彩票、电子老虎机、真人电子竞技游戏等多种娱乐方式选择,亚搏全站手机客户端-亚搏全站客户端官方让您尽享娱乐、赛事投注等,且无后顾之忧!

                      "

                       

                      Engineering construction

                      Malanje Secondary School Project (completed project)
                      Time:2013-09-17 10:00:00        Word size: Small Middle Large

                      Project: Malanje Secondary School Project.

                      Location: Malanje Province of Angola.

                      Construction Area:4081. m2

                            Owner:Angola Ministry of Education.

                      Commencement Time:June 18th,2006.

                      Completion Time:February 19th,2008.




                      Project introduction :Malanje Secondary School Project,located in Malanje city of Angola, covers an area of 21560 m2, including the building area of 4081.1 m2. According to the function, the school can be divided into the teaching district, laboratory, library, gym, teachers' office area and comprehensive stadium and also auxiliary buildings, such as the generator room, pump room, and daily pools, ect. After the completion of the project, the school possesses the advanced physical and chemical laboratories and matching experimental apparatus, to meet the physical, Chemical and experimental teaching task for middle school. Meanwhile, it has solved the problem of the local students study and improved the local teaching environment. It is beneficial to the improvement of the teaching quality of the local and overall culture quality of the adolescent. 


                      Copyright ? 2013 by Sinohydro Bureau NO.4 Co.,Ltd. All Rights Reserved